Back to Home

Operational Feasibility Assessment

Answer a few questions to assess site suitability for aerial application.

Requirements vary by jurisdiction. This assessment is informational only and not legal advice. Verify all requirements with CASA and your state agricultural authority.

Configuration

Site Characteristics

Terrain Type

Select the predominant terrain of the application area.

Block Size

Average size of application blocks.

Vegetation Density

Canopy density in the target application area.

Airspace & Environment

Controlled Airspace Nearby?

Is the site within or near controlled airspace?

Proximity to Dwellings or Public Areas

Distance to nearest sensitive receptors.

Typical Wind Conditions

Prevailing wind during intended spray periods.

Operational Setup

Intended Operation Type

How the T100 will be used.

Take-off / Landing Area Available?

Flat, clear area of at least 10m x 10m near the site.

Water / Refill Access

Proximity of water source for tank refilling.

Feasibility Summary

Overall Assessment

Suitability

Excellent Fit

Risk Level

Low

Constraints

0identified

Recommendation

Go — Operation suitable under standard conditions

Site conditions and operational setup are well-suited for aerial application under standard operating procedures.

Primary Constraints

Block Size

Medium blocks may reduce operational efficiency per sortie.

Feasibility score20 / 21

Higher score indicates fewer operational constraints.

This assessment is indicative only. Request a full report for site-specific analysis tailored to your operation.